Custom Printed Fade Effect Film in Hotel Bathrooms

Client | Hamilton Marino Builders Location | The Continental Hotel, Sorrento VIC
Application | Digitally Printed Fade Effex onto Optically Clear

Project Scope

This project involved the supply and installation of custom-printed fade effect film on the toilet doors and partition glass in a hotel, which separates the bathroom and bedroom areas of The Continental Hotel in Sorrento. The purpose of this installation was to provide guests privacy due to the bathrooms unique layout. Tint Design’s fade effex window film was installed on 66 bathroom doors and 30 highlight panels covering three levels on two separate buildings.

Tint Design is an industry leader in our production of high-quality white ink digital prints, in this instance, we printed our white fade onto optically clear window film to create a modern solution to an age-old privacy dilemma, this design complemented The Continental Hotels design aesthetic perfectly.

Project Challenges and Solutions

  • Project Turnaround

    Challenge: The project had a very tight schedule, requiring multiple visits to the site to manage the conditions and ensure timely completion.

    Solution: The team organised multiple site visits and coordinated closely with Hamilton Marino Builders to align with the construction schedule.

  • Dusty Environment

    Challenge: The presence of dust on-site posed a significant challenge, especially when installing a clear film that required a pristine environment for a quality finish.

    Solution: The team consulted with the builder to ensure we were able to install at the right time and therefore in suitable working conditions to ensure a dust-free environment. Regular cleaning and careful preparation of the surfaces were conducted.

  • Precise Installation

    Challenge: The need for precise cuts around door handles and latches required a high level of accuracy.

    Solution: Custom templates were created for consistent cuts around door handles, and hand-cutting techniques were used for the latches.

  • Lighting Conditions:

    Challenge: Many rooms were not energized, necessitating work under low light conditions.

    Solution: The team used a dedicated lighting systems to illuminate rooms to ensure proper visibility and accuracy during installation

  • Ensuring Correct Finish

    Challenge: Achieving the desired finish required pre-installation testing and adjustments.

    Solution: A test room was used to perfect the installation process for the toilet doors. Multiple samples were installed on-site for the architects to review, ensuring the correct fade effect was achieved.

Despite the challenges faced, the project was successfully completed with all 66 doors and 30 highlight panels installed with the custom-printed fade effect film. The careful planning, customised solutions, and dedication to quality ensured that the hotel achieved the desired privacy and aesthetic enhancement for its bathroom areas.

This case study demonstrates the importance of adaptability, planning, and the ability to overcome site-specific challenges to deliver a high-quality finish in a time-sensitive project.